# Condo HVAC Projects in Toronto and the GTA

Every project on this page was run by 

Condo HVAC Repair Toronto

[/ →](/)

 crews and is documented with the same attributes: scope, price, payment terms, lead time, time on site, client type, crew and equipment. No vague case studies, just the record.

9

Documented projects

892

Suites covered

$1.77M

Combined value

6

GTA areas

Project Records

## Named Projects With Full Attributes

From a 24-unit heat pump repair in Downtown Markham to a 180-unit fan coil replacement in Mimico. Open any project for the challenge, the approach, the results and photos.

 

![Two technicians descaling an open McQuay vertical fan coil in a Yorkville condo suite](/images/misc/two-hvac-technicians-in-navy-workwear-descaling-an.webp) Yorkville

### Yorkville 42-Unit Tower

Annual Fan Coil Service Program

$38,500 CAD

Scope

42 coil descales + 4 pumps + 11 valves

Price

$38,500

Payment

Annual service contract, invoiced per service night

Lead time

3 weeks from board approval

On site

3 service nights across 2 weeks

Client

Condo board (2001 tower)

Crew

Marcus Chen (Ops Mgr) + 4 technicians

Equipment

McQuay vertical fan coils, 2001 vintage

View full project record

[Yorkville 42-Unit Tower →](/projects/yorkville-42-unit-annual-service/)

 

![Crew setting a new vertical fan coil cabinet in a Mimico lakefront condo suite](/images/misc/hvac-crew-of-three-setting-a-new-vertical-fan-coil.webp) Mimico

### Mimico 180-Unit Lakefront

Building-Wide Fan Coil Replacement

$186,000 CAD

Scope

Rolling fan coil replacement

Price

$186,000

Payment

Progress billing by floor, holdback at commissioning

Lead time

8 weeks equipment procurement

On site

14-week rolling install

Client

Condo corporation board

Crew

Elena Vargas (Ops Mgr) + 2 crews

Equipment

Replacement vertical fan coils with ECM motors

View full project record

[Mimico 180-Unit Lakefront →](/projects/mimico-180-unit-fan-coil-replacement/)

 

![Technicians sliding a Trane water-source heat pump chassis out of a condo closet in Markham](/images/misc/two-technicians-sliding-a-trane-water-source-heat-.webp) Downtown Markham

### Downtown Markham 24-Unit Mid-Rise

Water-Source Heat Pump Repair

$14,200 CAD

Scope

Reversing valves + contactors

Price

$14,200

Payment

Progress invoiced, net 30

Lead time

1 week

On site

6 days over one season

Client

Property manager (24-unit mid-rise)

Crew

James Kowalski (Ops Mgr) + 2 technicians

Equipment

Trane Axiom water-loop heat pumps

View full project record

[Downtown Markham 24-Unit Mid-Rise →](/projects/downtown-markham-24-unit-heat-pump-repair/)

 

![Technicians lifting a new Magic-Pak MGE unit into a closet in an Agincourt low-rise](/images/misc/three-technicians-lifting-a-new-magic-pak-mge-thro.webp) Agincourt

### Agincourt Low-Rise Magic-Pak

Two-Floor Magic-Pak Replacement

$92,800 CAD

Scope

16 units to MGE series + louvers

Price

$92,800

Payment

50% deposit, balance at sign-off (bulk 10+ pricing)

Lead time

5 weeks

On site

8 working days

Client

Facilities director, condo corporation

Crew

David Okonkwo (Ops Mgr) + 3 technicians

Equipment

Magic-Pak MGE series

View full project record

[Agincourt Low-Rise Magic-Pak →](/projects/agincourt-magic-pak-floor-replacement/)

 

![Chemical descaling cart connected to the Humber Bay building loop](/images/misc/two-technicians-connecting-a-chemical-flush-cart-t.webp) Humber Bay Shores

### Humber Bay 320-Unit Riser Flush

Chemical Descaling + Primary Pump Replacement

$42,800 CAD

Scope

18-stack flush + 2 primary pumps

Price

$42,800

Payment

25% diagnostic approval, 50% flush completion, 25% at sign-off

Lead time

3 weeks from signed contract

On site

2 weeks (3 days diagnostic + 10-day flush + 2 days pump replacement)

Client

Property manager + condo corporation (2008 tower)

Crew

Elena Vargas (Ops Mgr) + 3 flush technicians + chemistry lab

Equipment

Original 18-stack vertical hydronic risers + Grundfos primary circulators

View full project record

[Humber Bay 320-Unit Riser Flush →](/projects/humber-bay-shores-320-unit-riser-flush/)

 

![Magic-Pak MGE series PTACs staged in a King West corridor](/images/misc/crew-booking-the-service-elevator-at-a-king-west-c.webp) King West

### King West 65-Unit Magic-Pak

Zero-Guest-Displacement Replacement Program

$287,500 CAD

Scope

65 PTACs swapped + 12 louver reframes

Price

$287,500

Payment

15% deposit, weekly progress, 10% retention

Lead time

6 weeks (MGE manufacturer lead time)

On site

6 consecutive weeks on-site

Client

Corporate rental operator (1996 building)

Crew

Marcus Chen (Ops Mgr) + 3-tech crew + guest coordinator

Equipment

Magic-Pak HWC → MGE series + 12 louver reframes

View full project record

[King West 65-Unit Magic-Pak →](/projects/king-west-65-unit-magic-pak-replacement/)

 

![Water staining on the ceiling of the suite below the Agincourt leak](/images/features/technicians-drying-out-a-water-damaged-condo-close.webp) Agincourt

### Agincourt Saturday Emergency

90-Minute On-Site + Written Insurance Documentation

$1,485 CAD

Scope

2 AM dispatch + pan + pump + report

Price

$1,485

Payment

$285 diagnostic on completion + 50/50 on repair package

Lead time

90 minutes from first call

On site

3.5 hours emergency visit + 2 hours Monday follow-up

Client

Individual condo owner (1998 mid-rise)

Crew

David Okonkwo (Ops Mgr) + 1 after-hours emergency technician

Equipment

First Co vertical fan coil, original galvanized pan replaced with zinc-coated steel

View full project record

[Agincourt Saturday Emergency →](/projects/agincourt-saturday-emergency-fan-coil-pan-leak/)

 

![ClimateMaster Tranquility chassis staged for Thornhill program install](/images/misc/two-technicians-sliding-a-trane-water-source-heat-.webp) Thornhill

### Thornhill 220-Unit Heat Pump

32-Week Building-Wide Replacement with 100% Resident Retention

$945,000 CAD

Scope

220 heat pumps + 220 rail mods

Price

$945,000

Payment

10% deposit, monthly progress, 10% retention

Lead time

12 weeks (ClimateMaster manufacturer + rail modification engineering)

On site

32 consecutive weeks on-site + 1 week buffer

Client

Condo board + reserve fund consultant (1992 luxury tower)

Crew

Rachel Simard (Ops Mgr) + 5-tech crew + chassis specialist + resident coordinator

Equipment

Trane Axiom → ClimateMaster Tranquility 30 water-source heat pumps + Belimo zone valves

View full project record

[Thornhill 220-Unit Heat Pump →](/projects/thornhill-220-unit-heat-pump-replacement-program/)

 

![Magic-Pak MCE series PTAC install at Oakville Place mid-rise](/images/misc/exterior-brick-wall-of-an-oakville-low-rise-condo-.webp) Oakville Place area

### Oakville Place 24 Magic-Pak

Three Problems, One Program

$162,000 CAD

Scope

24 PTACs + 24 louvers + 24 acoustic

Price

$162,000

Payment

20% deposit, bi-weekly progress, 10% retention

Lead time

8 weeks (MCE manufacturer + louver engineering)

On site

10 consecutive weeks on-site

Client

Facilities director + condo board (1991 mid-rise)

Crew

Siobhan Nguyen (Ops Mgr) + 3-tech crew + louver / exterior specialist

Equipment

Magic-Pak HWC → MCE series + exterior louver reframes + R-11 mineral wool acoustic retrofit

View full project record

[Oakville Place 24 Magic-Pak →](/projects/oakville-place-24-magic-pak-end-of-life-replacement/)

Want to see the work as photos instead? Visit the 

project gallery

[/gallery/ →](/gallery/)

.

![](/images/misc/two-hvac-technicians-and-an-operations-manager-wal.webp)

24-Hour Condo Emergency Dispatch

## Have a Building That Needs a Plan?

Boards and property managers get a free walk-through, readings in sample suites and a written proposal they can take to the next meeting.

Book a $185 Diagnostic

[/contact/ →](/contact/)

 

Call (437) 523-7002

[tel:+14375237002 →](tel:+14375237002)

-   \* Written scope before work
-   \* TSSA + Enbridge Red Tag + ESA + WSIB
-   \* Written workmanship warranty