# King West 65-Unit Furnished Rental Building Magic-Pak HWC to MGE Replacement

A documented project record from 

Condo HVAC Repair Toronto

[/ →](/)

. A 1996 King West building running as a 65-unit furnished corporate rental was averaging 10-12 Magic-Pak failures per year. The replacement program ran floor-by-floor over 6 weeks with zero displaced guests, scheduled around real-time booking data.

By The Condo HVAC Repair Toronto Crew

$287,500 CAD 6 consecutive weeks on-site 65 suites

![Magic-Pak MGE series PTACs staged in a King West corridor](/images/misc/crew-booking-the-service-elevator-at-a-king-west-c.webp)

Project Record

## Project Attributes

Scope

65 Magic-Pak HWC series PTACs replaced with MGE series over 6 weeks with zero displaced guests

Price

$287,500 CAD

Payment

15% deposit, weekly progress, 10% retention

Lead time

6 weeks (MGE manufacturer lead time)

On site

6 consecutive weeks on-site

Client

Corporate rental operator (1996 building)

Crew

Marcus Chen (Ops Mgr) + 3-tech crew + guest coordinator

Equipment

Magic-Pak HWC → MGE series + 12 louver reframes

Neighbourhood

King West

Building

65 suites, 1996 construction

## The Challenge

A 1996 King West furnished corporate rental building was logging 10-12 Magic-Pak HWC failures per year across 65 suites. Each failure meant a displaced guest, a 2-3 day turnaround, and a potential liability on the booking platform.

The operations director needed a floor-by-floor replacement with zero displaced guests as a non-negotiable requirement.

### Results

-   All 65 units replaced across 6 weeks with zero displaced guests.
-   100% guest acceptance on 12 in-stay coordination requests.
-   Approximately 15% reduction in combined heating and cooling energy use post-replacement.
-   Zero commissioning failures, zero guest complaints during or after program.

## How We Ran It

1.  1
    
    ### Real-time booking coordination
    
    Operations team shared live booking data. 53 of 65 units were scheduled into natural check-out windows (3+ hour vacancies). The remaining 12 were coordinated directly with in-stay guests at mutually convenient times.
    
2.  2
    
    ### Floor-by-floor rolling swap
    
    Six weeks on-site, 11 units per week, working top-floor-down in 2-floor increments. 90-minute install window per suite with 4-technician crew.
    
3.  3
    
    ### Louver reframing for MGE profile
    
    MGE chassis required slightly wider exterior louver on 12 of 65 units. Louvers reframed with new weatherstripping as part of the swap sequence.
    
4.  4
    
    ### New 24V thermostats and commissioning
    
    Every suite received a new 24V thermostat for MGE compatibility plus 15-minute heat and cool verification before sign-off.
    

On Site

## Project Photos

Click any photo to enlarge it.

 

> "Not a single guest was displaced. The MGE units run quieter than the HWCs ever did and our utility bills are down about 15 percent since the swap."

Daniel K., Operations director, corporate rental

Related

## More Condo HVAC Projects

Magic-Pak PTAC Replacement service

[/magic-pak-replacement/ →](/magic-pak-replacement/)

 

Condo HVAC in Downtown Toronto

[/locations/downtown-toronto/ →](/locations/downtown-toronto/)

 

![Two technicians descaling an open McQuay vertical fan coil in a Yorkville condo suite](/images/misc/two-hvac-technicians-in-navy-workwear-descaling-an.webp) Yorkville

### Yorkville 42-Unit Tower

Annual Fan Coil Service Program

$38,500 CAD

Scope

42 coil descales + 4 pumps + 11 valves

On site

3 service nights across 2 weeks

Crew

Marcus Chen (Ops Mgr) + 4 technicians

Equipment

McQuay vertical fan coils, 2001 vintage

Neighbourhood

Yorkville

View full project record

[Yorkville 42-Unit Tower →](/projects/yorkville-42-unit-annual-service/)

 

![Crew setting a new vertical fan coil cabinet in a Mimico lakefront condo suite](/images/misc/hvac-crew-of-three-setting-a-new-vertical-fan-coil.webp) Mimico

### Mimico 180-Unit Lakefront

Building-Wide Fan Coil Replacement

$186,000 CAD

Scope

Rolling fan coil replacement

On site

14-week rolling install

Crew

Elena Vargas (Ops Mgr) + 2 crews

Equipment

Replacement vertical fan coils with ECM motors

Neighbourhood

Mimico

View full project record

[Mimico 180-Unit Lakefront →](/projects/mimico-180-unit-fan-coil-replacement/)

 

![Technicians sliding a Trane water-source heat pump chassis out of a condo closet in Markham](/images/misc/two-technicians-sliding-a-trane-water-source-heat-.webp) Downtown Markham

### Downtown Markham 24-Unit Mid-Rise

Water-Source Heat Pump Repair

$14,200 CAD

Scope

Reversing valves + contactors

On site

6 days over one season

Crew

James Kowalski (Ops Mgr) + 2 technicians

Equipment

Trane Axiom water-loop heat pumps

Neighbourhood

Downtown Markham

View full project record

[Downtown Markham 24-Unit Mid-Rise →](/projects/downtown-markham-24-unit-heat-pump-repair/)

![](/images/misc/operations-manager-presenting-a-written-hvac-scope.webp)

24-Hour Condo Emergency Dispatch

## Planning Work Like This in Your Building?

Start with a free walk-through and readings in sample suites. Your board gets a written scope, per-unit pricing and a schedule before anyone commits.

Book a $185 Diagnostic

[/contact/ →](/contact/)

 

Call (437) 523-7002

[tel:+14375237002 →](tel:+14375237002)

-   \* Written scope before work
-   \* TSSA + Enbridge Red Tag + ESA + WSIB
-   \* Written workmanship warranty