Condo HVAC Projects in Toronto and the GTA
Every project on this page was run by Condo HVAC Repair Toronto crews and is documented with the same attributes: scope, price, payment terms, lead time, time on site, client type, crew and equipment. No vague case studies, just the record.
Named Projects With Full Attributes
From a 24-unit heat pump repair in Downtown Markham to a 180-unit fan coil replacement in Mimico. Open any project for the challenge, the approach, the results and photos.
Yorkville Yorkville 42-Unit Tower
Annual Fan Coil Service Program
- Scope
- 42 coil descales + 4 pumps + 11 valves
- Price
- $38,500
- Payment
- Annual service contract, invoiced per service night
- Lead time
- 3 weeks from board approval
- On site
- 3 service nights across 2 weeks
- Client
- Condo board (2001 tower)
- Crew
- Marcus Chen (Ops Mgr) + 4 technicians
- Equipment
- McQuay vertical fan coils, 2001 vintage
Mimico Mimico 180-Unit Lakefront
Building-Wide Fan Coil Replacement
- Scope
- Rolling fan coil replacement
- Price
- $186,000
- Payment
- Progress billing by floor, holdback at commissioning
- Lead time
- 8 weeks equipment procurement
- On site
- 14-week rolling install
- Client
- Condo corporation board
- Crew
- Elena Vargas (Ops Mgr) + 2 crews
- Equipment
- Replacement vertical fan coils with ECM motors
Downtown Markham Downtown Markham 24-Unit Mid-Rise
Water-Source Heat Pump Repair
- Scope
- Reversing valves + contactors
- Price
- $14,200
- Payment
- Progress invoiced, net 30
- Lead time
- 1 week
- On site
- 6 days over one season
- Client
- Property manager (24-unit mid-rise)
- Crew
- James Kowalski (Ops Mgr) + 2 technicians
- Equipment
- Trane Axiom water-loop heat pumps
Agincourt Agincourt Low-Rise Magic-Pak
Two-Floor Magic-Pak Replacement
- Scope
- 16 units to MGE series + louvers
- Price
- $92,800
- Payment
- 50% deposit, balance at sign-off (bulk 10+ pricing)
- Lead time
- 5 weeks
- On site
- 8 working days
- Client
- Facilities director, condo corporation
- Crew
- David Okonkwo (Ops Mgr) + 3 technicians
- Equipment
- Magic-Pak MGE series
Humber Bay Shores Humber Bay 320-Unit Riser Flush
Chemical Descaling + Primary Pump Replacement
- Scope
- 18-stack flush + 2 primary pumps
- Price
- $42,800
- Payment
- 25% diagnostic approval, 50% flush completion, 25% at sign-off
- Lead time
- 3 weeks from signed contract
- On site
- 2 weeks (3 days diagnostic + 10-day flush + 2 days pump replacement)
- Client
- Property manager + condo corporation (2008 tower)
- Crew
- Elena Vargas (Ops Mgr) + 3 flush technicians + chemistry lab
- Equipment
- Original 18-stack vertical hydronic risers + Grundfos primary circulators
King West King West 65-Unit Magic-Pak
Zero-Guest-Displacement Replacement Program
- Scope
- 65 PTACs swapped + 12 louver reframes
- Price
- $287,500
- Payment
- 15% deposit, weekly progress, 10% retention
- Lead time
- 6 weeks (MGE manufacturer lead time)
- On site
- 6 consecutive weeks on-site
- Client
- Corporate rental operator (1996 building)
- Crew
- Marcus Chen (Ops Mgr) + 3-tech crew + guest coordinator
- Equipment
- Magic-Pak HWC → MGE series + 12 louver reframes
Agincourt Agincourt Saturday Emergency
90-Minute On-Site + Written Insurance Documentation
- Scope
- 2 AM dispatch + pan + pump + report
- Price
- $1,485
- Payment
- $285 diagnostic on completion + 50/50 on repair package
- Lead time
- 90 minutes from first call
- On site
- 3.5 hours emergency visit + 2 hours Monday follow-up
- Client
- Individual condo owner (1998 mid-rise)
- Crew
- David Okonkwo (Ops Mgr) + 1 after-hours emergency technician
- Equipment
- First Co vertical fan coil, original galvanized pan replaced with zinc-coated steel
Thornhill Thornhill 220-Unit Heat Pump
32-Week Building-Wide Replacement with 100% Resident Retention
- Scope
- 220 heat pumps + 220 rail mods
- Price
- $945,000
- Payment
- 10% deposit, monthly progress, 10% retention
- Lead time
- 12 weeks (ClimateMaster manufacturer + rail modification engineering)
- On site
- 32 consecutive weeks on-site + 1 week buffer
- Client
- Condo board + reserve fund consultant (1992 luxury tower)
- Crew
- Rachel Simard (Ops Mgr) + 5-tech crew + chassis specialist + resident coordinator
- Equipment
- Trane Axiom → ClimateMaster Tranquility 30 water-source heat pumps + Belimo zone valves
Oakville Place area Oakville Place 24 Magic-Pak
Three Problems, One Program
- Scope
- 24 PTACs + 24 louvers + 24 acoustic
- Price
- $162,000
- Payment
- 20% deposit, bi-weekly progress, 10% retention
- Lead time
- 8 weeks (MCE manufacturer + louver engineering)
- On site
- 10 consecutive weeks on-site
- Client
- Facilities director + condo board (1991 mid-rise)
- Crew
- Siobhan Nguyen (Ops Mgr) + 3-tech crew + louver / exterior specialist
- Equipment
- Magic-Pak HWC → MCE series + exterior louver reframes + R-11 mineral wool acoustic retrofit
Want to see the work as photos instead? Visit the project gallery.
Have a Building That Needs a Plan?
Boards and property managers get a free walk-through, readings in sample suites and a written proposal they can take to the next meeting.
- Written scope before work
- TSSA + Enbridge Red Tag + ESA + WSIB
- Written workmanship warranty