Agincourt Saturday 2 AM Fan Coil Pan Leak Emergency Response
A documented project record from Condo HVAC Repair Toronto. An Agincourt condo owner called at 2 AM Saturday with water through her ceiling into the suite below. Phone-guided isolation stopped the flow in 10 minutes, on-site in 90 minutes, dry and documented by 7 AM. Written incident report cleared her insurance file with zero liability finding.
By The Condo HVAC Repair Toronto Crew
Project Attributes
- Scope
- After-hours pan replacement plus condensate pump, float switch and written insurance documentation
- Price
- $1,485 CAD
- Payment
- $285 diagnostic on completion + 50/50 on repair package
- Lead time
- 90 minutes from first call
- On site
- 3.5 hours emergency visit + 2 hours Monday follow-up
- Client
- Individual condo owner (1998 mid-rise)
- Crew
- David Okonkwo (Ops Mgr) + 1 after-hours emergency technician
- Equipment
- First Co vertical fan coil, original galvanized pan replaced with zinc-coated steel
- Neighbourhood
- Agincourt
- Building
- 1 suite (emergency single-suite call), 1998 construction
The Challenge
An Agincourt condo owner was woken at 2 AM Saturday by her downstairs neighbour reporting water through his bedroom ceiling. She had no idea what had failed in her suite or how to stop it. The downstairs neighbour was talking about calling his insurance in the morning.
She needed someone on-site immediately plus written documentation that would protect her from a liability claim.
Results
- Active water flow stopped at 2:10 AM via phone-guided isolation.
- On-site at 3:30 AM, dry and documented by 7 AM Sunday.
- Both insurance files closed within 30 days with zero liability finding against the owner.
- Downstairs neighbour ceiling repair handled by building master insurance policy.
How We Ran It
- 1
Phone-guided water isolation
Our emergency dispatcher walked her through locating the isolation valves at her fan coil closet and shutting off supply water. Active water flow stopped within 10 minutes of her first call.
- 2
On-site in 90 minutes
David Okonkwo arrived at 3:30 AM with a First Co parts kit. Confirmed the source as a corroded through-rust pinhole in the original 1998 galvanized pan. Photographed everything for the insurance file.
- 3
Pan, pump and float switch replacement
Original galvanized pan replaced with upgraded zinc-coated steel. New Little Giant condensate pump and float switch installed. Float switch tested by intentionally flooding the pan to prove the safety shutoff operated correctly.
- 4
Written incident report for insurance
Twelve-photo incident report delivered showing equipment failure (not negligence), proper emergency response, and remediation scope. Owner forwarded copies to her broker and the downstairs neighbour’s property manager.
Project Photos
Click any photo to enlarge it.
"David’s crew was in my suite 90 minutes after I called. The paperwork was ready for my insurance by morning and I had a written explanation I could give my downstairs neighbour."
Jennifer K., Condo owner, Agincourt
More Condo HVAC Projects
Yorkville Yorkville 42-Unit Tower
Annual Fan Coil Service Program
- Scope
- 42 coil descales + 4 pumps + 11 valves
- On site
- 3 service nights across 2 weeks
- Crew
- Marcus Chen (Ops Mgr) + 4 technicians
- Equipment
- McQuay vertical fan coils, 2001 vintage
- Neighbourhood
- Yorkville
Mimico Mimico 180-Unit Lakefront
Building-Wide Fan Coil Replacement
- Scope
- Rolling fan coil replacement
- On site
- 14-week rolling install
- Crew
- Elena Vargas (Ops Mgr) + 2 crews
- Equipment
- Replacement vertical fan coils with ECM motors
- Neighbourhood
- Mimico
Downtown Markham Downtown Markham 24-Unit Mid-Rise
Water-Source Heat Pump Repair
- Scope
- Reversing valves + contactors
- On site
- 6 days over one season
- Crew
- James Kowalski (Ops Mgr) + 2 technicians
- Equipment
- Trane Axiom water-loop heat pumps
- Neighbourhood
- Downtown Markham
Planning Work Like This in Your Building?
Start with a free walk-through and readings in sample suites. Your board gets a written scope, per-unit pricing and a schedule before anyone commits.
- Written scope before work
- TSSA + Enbridge Red Tag + ESA + WSIB
- Written workmanship warranty